Reference Documents

This page contains a list of reference documents that have been prepared by the Board of Education and distributed to the Ad-Hoc Committee and the Public.

Many documents are marked DRAFT. All Documents are marked DRAFT until they are officially accepted and approved by the Board of Education.

Demographic Study - April 2017
Demographic Study - April 2017 (12 MB)
This document contains the filing dates with the Clerk of Elections and the NJ State Department of Education for referendums.
Election Advisory Timelines for District Referenda 2016 (165 kB)
This document contains the filing dates with the Clerk of Elections and the NJ State Department of Education for referendums.
Election Advisory Timelines for District Referenda 2017
Election Advisory Timelines for District Referenda 2017 (41 kB)
This is a 2009 letter from the NJ State Department of Education to Sea Bright Borough School District approving their plan to merge with the Oceanport School District for Pre-K through 8th grade.
Elimination of the Sea Bright Borough School District 2009 (3 MB)
This is a 2009 letter from the NJ State Department of Education to Sea Bright Borough School District approving their plan to merge with the Oceanport School District for Pre-K through 8th grade.
Facilities Efficiency Standards
Facilities Efficiency Standards (35 kB)
Facilities Guide for Technology
Facilities Guide for Technology (6 MB)
This is a draft of the Feasibility Study and Educational Specifications that was prepared on August 10th, 2016.
Feasibility Study Draft - 2016-08-10 (11 MB)
This is a draft of the Feasibility Study and Educational Specifications that was prepared on August 10th, 2016.
Feasibility Study Draft - 2017-05-04
Feasibility Study Draft - 2017-05-04 (22 MB)
FMERA School Options - April 2017
FMERA School Options - April 2017 (5 MB)
Maple Place Needs Assessment - Draft - April 2017
Maple Place Needs Assessment - Draft - April 2017 (482 kB)
This is the brochure and overview for the Monmouth Park Corporate Center II building (previously known as the Commvault building) located at 2 Crescent Place, Oceanport, NJ.
Monmouth Park Corporate Center II Brochure (3 MB)
This is the brochure and overview for the Monmouth Park Corporate Center II building (previously known as the Commvault building) located at 2 Crescent Place, Oceanport, NJ.
This is a 2010 letter from the NJ State Department of Education outlining a process change for the filing of the Long Range Facility Plan.
New Timeline for Required Long-Range Facilities Plan Update 2010 (55 kB)
This is a 2010 letter from the NJ State Department of Education outlining a process change for the filing of the Long Range Facility Plan.
This is an explanation of the Oceanport Board of Education's current debt obligations and available borrowing capacity as of August 1st, 2015.
Oceanport Long Term Dept - 2016-09-12 (94 kB)
This is an explanation of the Oceanport Board of Education's current debt obligations and available borrowing capacity as of August 1st, 2015.
This is the Oceanport School District 2008 Long Range Facility Plan.
Oceanport School District 2008 LRFP (2 MB)
This is the Oceanport School District 2008 Long Range Facility Plan.
Referendum Framework Board Presentation - 2017-02-22
Referendum Framework Board Presentation - 2017-02-22 (376 kB)
Referendum Justification Resolution - 2017-04-26
Referendum Justification Resolution - 2017-04-26 (50 kB)
Tax Impact Analysis - Draft - 2017-04
Tax Impact Analysis - Draft - 2017-04 (1 MB)
Wolf Hill Needs Assessment - Draft - April 2017
Wolf Hill Needs Assessment - Draft - April 2017 (495 kB)
This is Option #5 that was prepared by JBA Architecture for the Ad-Hoc Committee regarding a Minor Renovations and Major Additions version of the potential changes for Wolf Hill School. Options 1 through 4 can be found in the Feasibility Study Draft 2016-08-10, Appendix E.
Wolf Hill School - Option 5 - September 2016 (1 MB)
This is Option #5 that was prepared by JBA Architecture for the Ad-Hoc Committee regarding a Minor Renovations and Major Additions version of the potential changes for Wolf Hill School. Options 1 through 4 can be found in the Feasibility Study Draft 2016-08-10, Appendix E.